Referenzen

2015 2011-ongoing: Development and implementation of a tailored mixed plastic quality MBO (MTM/HTP)
  HSEQ-Project - Set up and supervision of the implementation of a centralised HSEQ - System (Tönsmeier)
  Production of customised MPO - Plant and process optimisation to enable the production of customer-tailored mixed plastic fraction from German LVP-material (Sita)
  PMD sorting plant (Rotterdam) - Extension of Sitas sorting plant by additional separation stages - all phases (SITA)
  MBT with KFF separation (Omrin)
  Sorting facility for MSW with integrated sorting of dry recyclables (Twence B.V.)
  Coordiation services on Incinerator Bottom Ash processing and re-use strategies (Indaver)
2014 PMD sorting plant (Antwerp) - Improvement of process, integration of new NIR-sorters and enhancement of throughput - concept to commissioning test (INDAVER)
  PMD sorting plant (Rotterdam) - Adaption of Sitas sorting plant by additional separation stages - all phases (SITA)
  MBT - Integration of new metal separation stages for ferrous metals and non-ferrous metals (RegAB)
2013 Performance tests of sorting facility - Performance test for sorting stages for dry recyclables by sample taking and balancing. Expert"s report regarding final acceptance of project.(Indaver)
  PMD sorting plant (NRW) - PMD sorting plant with polymeric separator circuit; capacity 100.000t/a; invest 10 m € (without infrastructures) - all phases (LOBBE)
  MRF/MBT for MHW - Troubleshooting, technical advise for reengineering (Longly Lane MBT)
  MBT with KFF separation (Omrin)
2012 Suggestions for determining quotas for household packaging waste (federal enviromental agency)
  Detailed mass-balance for entire sorting process (Omrin)
  MRF for MHW (London) - feasibility study and basic layout of pre-treatment-process and -plant design (eon)
  MBT - Critical review, pre-treatment process Troubleshooting, technical advise for reengineering (Biffa)
  Finalisation and reengineering of the RDF plant (KSC Schwedt)
2011 2011 - 2014: Enhanced collection scheme for recyclables "Wertstofftonne" (several clients)
  Optimised allocation of waste items to a "dry recyclables bin" (federal enviromental agency)
  Sorting plant mixes dry recyclables - Multifunctional sorting plant with screening and shifting steps and 2 NIR-sorters, production of RDF < 25mm; Capacity approx. 250t/h; -all phase and interim plant management (Entsorgung Dortmund)
  PMD sorting plant (Rotterdam) - PMD sorting plant with polymeric separator circuit ; invest 7 m € (without infrastructures) - all phases (SITA)
2009 PMD sorting plant (Trier) - Improvement and enlargement of existing PMD -Sorting plant capacity 100.000 t/a; invest 5 m € - all phases (A.R.T.)
  PMD pilot plant - Critical revue of concept, optimisation of pilot plant (OMRIN)
2008 PMD sorting plant (south) - sorting plant with polymeric separator circuit and integrated mixed plastic process; invest 12 m € (without infrastructures) - all phases (Veolia)
  PMD sorting plant (Hamburg) - sorting plant with polymeric separator circuit and integrated mixed plastic process; invest 14 m € (without infrastructures) - all phases (Veolia)
  MPT (Reinickendorf) - Improvement of process, additional sorting steps: screening, shifting, NIR-sorting - reengineering to construction supervision and optimisation of production (ALBA)
  MPT (Pankow) - Improvement of process, additional sorting steps: screening, shifting, NIR-sorting - reengineering to construction supervision and optimisation of production (ALBA)
  MBT Haase system - Technical SWOT analysis - concept for improvement
  MBT Herhoff System - Pilot plant to recover recycling material - concept to construction supervision (RegAb)
  MBT - Integration of automatic sorting lines to recover recycling material - concept to performance test (IAG)
2007 Sorting plant for industrial and commercial waste (Eichenzell) - Several separation steps for heavies, metals and fines, three granulators with a capacity of 15 t/h - conception to performance test (Sulo)
  Sorting plant for separate collected paper (Berlin) - Sorting plant for separate collected waste paper, including paper spike and NIR-sorters, capacity of > 20 t/h - concept to construction supervision (ALBA)
  Sorting plant for separate collected waste paper, including paper spike and NIR-sorters, capacity of > 20 t/h - concept to construction supervision (ALBA)
  Sorting plant for C&I waste, bulky waste, production of RDF (Hamburg) - Multifunctional sorting plant with several screening and shifting steps and 5 NIR-sorters, production of RDF < 25mm; Capacity approx. 25 t/h; invest 15 m € - concept to construct
  PMD sorting plant (Berlin) - New development of a sorting plant with polymeric separator circuit, throughput rate >15 t/h; investment app. 20 m € - concept to construction supervision (ALBA)
2006 Sorting plant for C&I waste, bulky waste, production of RDF (Bochum) - Waste treatment centre with three lines and a total capacity of 290.000 t/a, new process for bulky refuse with NIR-technology -conception to performance test (USB)
  Sorting plant for industrial and commercial waste (Dortmund) - New waste treatment process with shifting screening and grinding the RDF to 25 mm -conception to performance test (DOGA)
  Sorting plant for industrial and commercial waste, demolition debris (Berlin) - Improvement of plant design and integration of new sorting and grinding steps -conception to performance test (ALBA)
  Sorting plant for separate collected paper (Leipzig) - New development of a sorting plant for separate collected waste paper, including paper spike and NIR-sorters - concept to construction supervision (ALBA)
  PMD sorting plant (Porta) - New development of a sorting plant with polymeric separator circuit, throughput rate >15 t/h - concept to construction supervision (Tönsmeier)
  PMD sorting plant (Braunschweig) - PMD sorting plant with polymeric separator circuit and integrated mixed plastic process; invest 12,5 m € - all phases (ALBA)
  PMD sorting plant (Oppin) - PMD and commercial waste sorting plant with polymeric separator circuit and integrated mixed plastic process; invest 12,5 m € (without infrastructures) - all phases (Tönsmeier)
2005 Sorting plant for industrial and commercial waste - Several separation steps for heavies, metals and fines, three granulators with a capacity of 15 t/h - conception to construction supervision (Cleanaway)
2004 Sorting plant for industrial and commercial waste (Antwerp) - Reengineering of process with shifting screening and grinding the RDF to 60 mm, integration of pellet presses; capacity 12 t/h -conception to performance test (INDAVER)
  PMD sorting plant (Herne) - Improvement of process, integration of new NIR-sorters - concept to commissioning test (Cleanaway)
  PMD sorting plant (Leipzig) - PMD sorting plant with polymeric separator circuit - all phases (ALBA)
2002 Sorting plant für PMD commingled - Development of a complete new integrated process with pre separation steps, washing and density separation for plastics and regranulation, Invest 20 m € - process development to operation assistance (DSD / NORIS)
1999 since 1999: Analysis of compound type and percentage in LVP
1996 since 1996: Approval of mass flow for German LVP-material
Kategorie